Queensland Rail discovered the problem shortly after 6.30am. About 40 minutes later, Translink warned that all northern lines except Ferny Grove were experiencing delays, including the Airport, Caboolture, Doomben, Redcliffe Peninsula, Shorncliffe and Sunshine Coast lines.
The fault left trains being funnelled through two of the station's four tracks, affecting services travelling both north and south through the junction. Engineers fixed the issue just before 8am, meaning reduced capacity lasted for more than an hour.
The disruption was reported by Brisbane Times, WA Today and The Sydney Morning Herald.