LNP reveals preferred design for Bribie Island bridge duplication
Four-lane crossing expected to be complete before 2032 Olympic Games
The Crisafulli government has unveiled its preferred design for a new bridge to Bribie Island, with Transport Minister Brent Mickelberg stating the work should be finished before the 2032 Olympic Games. The existing bridge will be kept for pedestrians and cyclists.