The New Zealand Transport Agency (NZTA) has confirmed that construction has started on a new flyover at Waikare Gorge, which will become the country's highest road bridge. The first sod was turned at the site on Wednesday, October 7, 2026, signaling the beginning of the project.
The bridge is part of a larger effort to improve resilience on State Highway 2 in the Hawke's Bay region, where the existing route has been vulnerable to severe weather events. The new flyover is designed to lift the road above the gorge, reducing the risk of closures and damage during floods and slips.
The project has been planned to enhance connectivity and safety for motorists, freight operators, and local communities who rely on this vital transport link. Detailed engineering and environmental assessments have informed the design, with the bridge set to stand as a landmark infrastructure achievement for the country.
Officials have emphasized the importance of the project for regional recovery and long-term economic stability. Construction is expected to proceed over the coming years, with the NZTA managing the delivery.
The announcement has been welcomed by local leaders and residents who have long advocated for a more durable crossing. However, some have raised questions about the project's cost and timeline, though no detailed figures have been released in the initial announcement.
The bridge's completion will mark a significant upgrade to New Zealand's road network, providing a higher and more reliable route through the gorge.