Nepal's government said it was intensifying efforts to free workers trapped in tunnels at the Trishuli-3A and Upper Trishuli hydropower projects after flash floods swept through the region on Wednesday. The Nepal Army, leading the rescue operation, has been drilling into the tunnels since at least Saturday in an attempt to reach those inside.
Authorities on Friday received reports that around 350 people could be trapped inside a tunnel at the Upper Trishuli complex alone. The search covers at least five hydropower projects, though the total number of missing workers is unclear. Industry groups and private rescuers have joined the military in the operation.
On the Chinese side of the Himalayas, authorities reported 16 deaths in Gyirong County and 546 people missing.
The disaster has drawn international attention, with Australian Assistant Foreign Minister Matt Thistlewaite confirming that 43 Australians remain unaccounted for, up from an earlier figure. The figures underscore the scale of the humanitarian crisis as rescuers race against time and difficult terrain.